• Cost of Producing Concentrates from Ore

    12/04/2017· Mine operators, on the other hand, are accustomed to using costs per ton of ore as a basis for measuring the efficiency of then operations and for controlling them. Many companies are engaged only in mining or in mining and milling, and their final product is then either ore or concentrates; hence, cost per ton is the natural and convenient basis to employ. However, the value of ore

    Cost of Stoping for Underground Mining 911 Metallurgist

    05/04/2017· The cost of transporting ore from the mine to the mill on contract is $1 per ton. The milling cost of run-of-mine ore is taken as $2.85 and the cost of milling the sorted product is $3.22 per ton. The mill recovery on the unsorted ore is estimated at 80 percent, and the recovery on the sorted ore is 87 percent. The profit per ton of ore without sorting is shown in the following calculation

    Lowest cost per tonne: The economics of pit

    12/04/2012· Lowest cost per tonne: The economics of pit to port transportation. Andrew Keith, Mining Infrastructure Leader for Aurecon says: “Trends in the mining industry mean that transportation

    Metal Value per Tonne How You Can Determine the

    Conversely, when a mining company reports a drill result of 10 grams per tonne, you now know that this equals (10 x 0.029 =) 0.29 ounces per tonne. On the break even analysis page, I also explained how you can convert a drill result reported in a percentage (%) to an amount in pounds (lbs) per tonne.

    Operating Cost for Miners SRK Consulting

    Mine cost estimation may be done at many levels. At first it may be a simple “back of the envelope” estimation using similar operations to benchmark against. Later it may be decided to use an existing mine that the company owns and factor and compare costs against them. In the final stages a detailed bottom-up estimation based on first principles may be completed. This paper will

    Operating Costs of Gold Processing Plant 911 Metallurgist

    18/03/2016· The cost data above referred to has been compiled from actual operating results and shows the cost of milling both for the old 50-ton plant and the new 100 ton concentrator, as is now in use. Note the reduction in milling costs through the use of the new flowsheet which includes an 8-cell “Sub-A” Flotation Machine. The savings made in lower operation costs and lower maintenance costs

    Rio’s now mining iron ore for $14.30 a tonne MINING.COM

    03/08/2016· According to its half-year financial report the company’s Pilbara unit cash costs fell to $14.30 per tonne in 2016 first half compared to $16.20 per tonne in the same period last year.

    The Real Cost per Ton in Mining Production SPH Kundalia

    Contractor A. Contractor A charges a lower rate per ton (R18.50), but can only deliver the required 160 000 tons. The result is: Invoice cost. R2 960 000. Potential profit after costs. R14 055 968.

    Lowest cost per tonne: The economics of pit

    12/04/2012· Lowest cost per tonne: The economics of pit to port transportation. Andrew Keith, Mining Infrastructure Leader for Aurecon says: “Trends in the mining

    Cost Accounting in Mining 911 Metallurgist

    15/02/2017· The results of the cost-sheet, such as the total cost of mining, cost of milling, per ounce and per ton, together with other items of general interest, are plotted into graphic curves. These form very interesting and instructive diagrams, one of which is shown in Fig. 1. The upper line represents the average value of the ore in dollars per ton shipped; the next line below shows the total cost

    Mining Industry Introduction to Mining Financial

    Operating costs: Per ton basis (e.g., $2.50/ton for mining) Capital costs Cost of Capital Cost of capital is the minimum rate of return that a business must earn before generating value. Before a business can turn a profit, it must at least generate sufficient income to cover the cost of funding its operation.

    Low cost operating gold mine

    Mining Unit Costs The cost per ton for the month of December was $0.81 per ton reflecting the short haul distance to the crusher. For 1999 and beyond, mining cost per ton is expected to be in the range of $0.85 to $0.90. The depth of the pit and the height of the heap leach pad impact the truck-haul cycle time and unit cost, which is the most significant component of mining costs. Processing

    v115n8a17 Parametric estimation of capital costs for

    costs per ton of ore mined; for example, South African coal mining costs are quoted as rands per ton of coal produced. Figure 3 shows typical operating cost splits for relevant activities in the production cycle in open-pit mines. It can be seen that that hauling typically accounts for a significant proportion of the operating costs. The lowest cost activity in the production cycle is drilling

    Polymetallic deposit cut-off grade estimation

    Smelter cost per ton of concentrate Transportation costs per ton of concentrate Mining cost per tonne of ore Processing cost per tonne of ore Overhead cost per tonne of ore Processing costs and recoveries can vary based on geological characteristics such as mineralogy, hardness, clay content, and degree of oxidation, depending on the location of the deposit . Mine (external) Cut-off NSR

    Rio’s now mining iron ore for $14.30 a tonne

    03/08/2016· According to its half-year financial report the company’s Pilbara unit cash costs fell to $14.30 per tonne in 2016 first half compared to $16.20 per tonne in the same period last year.

    What Does the Grade of a Gold Mine Refer To?

    07/02/2020· Grams per tonne of milled ore, or g/t, is the most common metric used to represent the grade of ore. The value of a precious metals mine is determined by its

    pwc.au Productivity and Cost Management

    Haul ore and waste Process Issues can add 10 to 25% to downstream costs through: • Damage to fleet, ore body, mine plan • Inefficient processing • Waste of explosive • Re-work There needs to be sufficient stock of broken ground to: • Deliver preferred material blend to

    ore milling cost per tonne

    Mining Cost Per Ton Of Magnetite Ore. mineral processing operating cost estimate of ore treatment. kerr addison, for instance, is milling 2800 tons per day for a total of 72 cents per ton. hollinger in ,cost of crushing gold ore per ton,operating costs of gold processing plant a small gold mine flowsheet is shown below together with cost data which clearly shows the results that can be '

    Abstract USGS

    Note that capital costs are expressed in dollars and operating costs in dollars per short ton of material (ore and waste) mined. All costs are based on daily capacity of the mine (X) in short tons per day of material (ore and waste) moved. Figure 2 summarizes the cost curves for the base case total cost equations. Table 6. Small open pit mine model, base case: Category: Capital cost

    Mining Industry Introduction to Mining Financial

    Operating costs: Per ton basis (e.g., $2.50/ton for mining) Capital costs Cost of Capital Cost of capital is the minimum rate of return that a business must earn before generating value. Before a business can turn a profit, it must at least generate sufficient income to cover the cost of funding its operation.

    Opening New Mines

    The capital cost of mining was calculated using the equations below, where D is the daily capacity of the mine in tons of ore produced per day. The constant (i.e., first) term in each calculation is a blanket estimate based on published average initial capital investment in the industry (~USD 500 million for what is defined in this analysis as a large capacity mine) (Schuler, 2011). To

    How the Iron Ore Market Works (VALE, RIO)

    24/01/2020· In the final quarter of 2019, Fortescue Mining Group led its peers with a reported cash cost of $12.50 per ton. This compared to the $14.50 per ton cash cost reported by Vale.

    v115n8a17 Parametric estimation of capital costs for

    costs per ton of ore mined; for example, South African coal mining costs are quoted as rands per ton of coal produced. Figure 3 shows typical operating cost splits for relevant activities in the production cycle in open-pit mines. It can be seen that that hauling typically accounts for a significant proportion of the operating costs. The lowest cost activity in the production cycle is drilling

    How Are Iron Ore Miners Placed on the Cost Curve?

    14/10/2015· However, based on this analysis, iron ore prices should find medium-term support at prices ranging from $42–$45 per ton. As there is still more low-cost supply ready to come online, the biggest

    efficient cost per ton for manganese ore

    manganese cost per tontandartsderikx.nl. 10 50 ton per hour widely manganese mining · L/min liter per minute pct percent lb/st pound per short ton st short ton 50 pct of the iron could be extracted from a silicon steel slag that had been pretreated in hydrogen at 639,000 st of manganese ore, 476,000 st of ferromanganese,. Inquire Now; widely

    Low cost operating gold mine

    Mining Unit Costs The cost per ton for the month of December was $0.81 per ton reflecting the short haul distance to the crusher. For 1999 and beyond, mining cost per ton is expected to be in the range of $0.85 to $0.90. The depth of the pit and the height of the heap leach pad impact the truck-haul cycle time and unit cost, which is the most significant component of mining costs. Processing

    Economic of Copper Processing SlideShare

    23/06/2013· Effective costs of Copper Processing Example of porphyry copper mine processing costs Assuming a freight cost of £ 20/ton of concentrate, The total deduction are £ (0.61 + 0.56 + 0.41) = £ 1.58 The NSR per tonne of ore treated is thus As mining, milling, and other costs must be deducted from thisfigure, it is apparent that this mine with very low operatingcosts can have any hope of

    v115n8a17 Parametric estimation of capital costs for

    costs per ton of ore mined; for example, South African coal mining costs are quoted as rands per ton of coal produced. Figure 3 shows typical operating cost splits for relevant activities in the production cycle in open-pit mines. It can be seen that that hauling typically accounts for a significant proportion of the operating costs. The lowest cost activity in the production cycle is drilling

    How Are Iron Ore Miners Placed on the Cost Curve?

    14/10/2015· However, based on this analysis, iron ore prices should find medium-term support at prices ranging from $42–$45 per ton. As there is still more low-cost supply ready to come online, the biggest

    Polymetallic deposit cut-off grade estimation

    Smelter cost per ton of concentrate Transportation costs per ton of concentrate Mining cost per tonne of ore Processing cost per tonne of ore Overhead cost per tonne of ore Processing costs and recoveries can vary based on geological characteristics such as mineralogy, hardness, clay content, and degree of oxidation, depending on the location of the deposit . Mine (external) Cut-off NSR

    BHP Billiton and Iron Ore Unit Costs: A Peer Comparison

    25/08/2017· BHP has improved its unit costs, but they’re still higher than its closest peer, Rio Tinto,which reported unit costs of $13.80 per ton for its Pilbara operations in the first half of 2017.

    Evaluating rules of thumb using conveyor costs Canadian

    O n average, over all the scenarios we examined, total per-ton-mile operating costs for conveyor haul age were about 39% of those for truck transport. These costs include the diesel (US$2.65 per gallon) or electricity (US$0.087 per kWh) to propel the truck or the belt, maintenance and repair parts and labour, tires and an operator for the truck, and lubricants. All prices used in our analyses

    Making the grade: understanding exploration

    24/03/2017· As a rule of thumb, open pit mining can process ore for $10 per tonne and, where the ore grade is more than double that at $20 per tonne, results would be economic. Consider that 1% of

    Australia’s gold mines by production, grades and costs

    22/05/2019· As a case in point, a mine that produces 100,000 ounces of gold and 10,000 tonnes of copper per year at a cost of US$1000 per ounce, not including revenues generated from the sale of copper, will have AISCs well below US$1000 per ounce after the by

    Iron Ore MINING.COM

    Answering Mining's Big Questions

    How much gold is in a ton of ore? Quora

    24/02/2021· Pictured below is the Grasberg Mine in Indonesia. It takes 62 tons of ore to recover one ounce of gold. At the other end of the scale, one of the highest grade mines in the world is the Fire Creek underground mine in Lander County Nevada,whose o...

    Green Energy Reality Check: It's Not as Clean as You Think

    09/07/2020· While ore grades vary widely, copper ores typically contain only about a half-percent, by weight, of the element itself: thus, roughly 200 tons of ore are dug up, moved, crushed, and processed to get to one ton of copper. For rare earths, some 20 to 160 tons of ore are mined per ton of element. For cobalt, roughly 1,500 tons of ore are mined to

 